# How do I track estimates and actuals?

Checked 2026-11-15 against GilbApp d5296208bbffa2ab70076e6194f5537c4be1ddf7.

In the Value Tracking Table, type each cell's Estimate; after delivery press "Mark delivered", "Enter Actual", type "Status after", press "Set Status".

## Before you start

You need to be [signed in to GilbApp](http://support.gilb.com/help/how-do-i-sign-in-to-gilbapp) on a computer, with a vault you can write to, such as [your own vault](http://support.gilb.com/help/how-do-i-create-my-first-vault). The plan needs a Value Tracking Table with its Values as rows and its steps as columns, each Value with "Status", "Tolerable" and "Goal" numbers. The pictures show a made-up person on a test site; your screen shows your own name and address.

## Steps

1. Press "Main menu" at the top left and choose "Plan".

   Press "Main menu", next to your profile picture at the top left, and under "YOUR SECTIONS" choose "Plan". The button shows the name of the section you are in, such as "Vaults".

   A panel headed "GO TO" opens; "Plan" reads "Your Kai-Zen plan: Functions, Values, Development Resources and Solutions." You can also press the "Plan" button on the card of a vault \(the place where a person or a group keeps their records\) in "Vaults". The "Plan" screen lists your plan records and has the views "Grid", "Graph", "Both" and "Card".

   ![GilbApp with the "GO TO" panel open; "Plan" under "YOUR SECTIONS" is outlined in orange.](http://support.gilb.com/help/media/19263b830249232b.png)
   What you see: In the GO TO panel that opens from "Main menu" at the top left, look under YOUR SECTIONS on the left. The outlined row is "Plan", with the line "Your Kai-Zen plan: Functions, Values, Development Resources and Solutions." Press it to open the Plan screen.
2. Search and select the Value Tracking Table in the list.

   Type part of the table's tag \(its short name\) in the search box and select the Value Tracking Table in the list. The table opens in the middle of the screen.

   A Value Tracking Table \(VTT\) follows your Values and Development Resources across your steps: one column for each step, and in each cell the Estimate made before the step is built, then the Actual measured after it is delivered. A Value is a perceived benefit, measured as a number; a Development Resource is what the work uses up, such as money or time. A step, a Value Delivery Step, is the Solutions, or parts of them, delivered together in one short cycle to move some Values. The search box shows "Search in current filters…" while a filter is on, and "Search your vault…" otherwise. The button "VTT" in the row of kinds shows only Value Tracking Tables. Kai-Zen writes a VTT for each project it plans; Deeper, below the steps, says how to make one yourself.

   ![GilbApp's Plan screen with a word of the tag typed in the search box; the row of the Value Tracking Table is outlined in orange.](http://support.gilb.com/help/media/1044af5231fd19c0.png)
   What you see: On the Plan screen, a word of the table's tag is typed in the "RECORDS" search box, and the list shows the Value Tracking Table. The outlined text is the table's tag in that row. Click it to open the table.
3. Press the cell where a step meets a Value.

   Press the cell in a step's column and a Value's row. The right pane opens under "IMPACTS", headed by the step's tag, "→" and the Value's tag.

   If the table shows in the right pane instead, press "Open the table" there first. Above the table a line names the four stages, from "1 Estimate each cell" and "2 Build" to "3 Mark delivered \(column header\)" and "4 Enter the Actual", with the counts of columns delivered, Actuals entered and cells waiting under it. Each row shows its "Status" \(where it stands now\), "Tolerable" \(the survival limit\) and "Goal" \(the number you plan to reach; "Budget" for a Resource\); the table adds nothing up across a row. An empty cell shows "+" when you point at it. Until the step is delivered, the pane also shows "ACTUAL \(BEFORE → AFTER\)" with "Not delivered yet. The Actual is entered after delivery."

   ![GilbApp with a Value Tracking Table open; the empty cell where the step meets the Value is outlined in orange.](http://support.gilb.com/help/media/b3b0da72ac194a5e.png)
   What you see: The table is open in the middle: the Value's row with its "Status", "Tolerable" and "Goal" numbers, and the step's column with "Mark delivered" under its tag. The outlined box is the empty cell where they meet. Click it.
4. Press "+ Add an impact", type the Estimate and press Enter.

   In the right pane, press "+ Add an impact", type how far you expect the step to move the Value, such as -2.8 or +100, and press Enter \(for a Resource, the amount it uses\). This is the Estimate, written before the step is built: you type the change, not the end number.

   The cell then shows "ESTIMATE" and the change, with "Tol" and "Goal" and a %: how much of the way from "Status" to "Tolerable", and to "Goal", the step alone goes; a Resource's cell shows "Tol" and "Bud", toward its "Tolerable" and "Budget". Under "HOW SURE", the "Experience Level", the "±" range and "EVIDENCE" work as [the answer on comparing Solutions in a VDT](http://support.gilb.com/help/how-do-i-compare-solutions-in-a-vdt) shows. The Estimate shows only in tables that hold the step and under "Impacts" on the step's card, so it counts once. Repeat steps 3 and 4 for each cell before the step is built.

   ![GilbApp with the step's cell open in the right pane and -6 typed as the Estimate; the change box is outlined in orange.](http://support.gilb.com/help/media/697b45aff3e11001.png)
   What you see: On the right, under "IMPACTS", the heading names the step and the Value. After "+ Add an impact", the outlined box holds -6, the Estimate. Press Enter to save it. "ACTUAL \(BEFORE → AFTER\)" below says "Not delivered yet."
5. When the step is delivered, press "Mark delivered" under its tag.

   Once the step is delivered, press "Mark delivered" under its tag at the top of its column. In the Kai-Zen method a step is delivered when real stakeholders can use it, and it is measured there, not on a test copy.

   A stakeholder is a person, group or system that cares whether a Value goes up or down. GilbApp then adds the status "Developed", dated today, with you as its source, and the header shows it; it counts a step as delivered once its "Status" is "Developed" or "Production". In GilbVeda, the shared list of terms, "Developed" means built and tested but not yet serving its stakeholders in production; a later "+ Add" beside "Status" on the step's card adds "Production", which means it serves them. In the pane, the button that reads "Mark", the step's tag and "delivered" does the same. From then on the Estimates stay as they stood: the pane says "Delivered: the Estimate stays as it stood. The Actual is above." Only a person who may write the step sees the link.

   ![GilbApp with the Value Tracking Table and the Estimate's details in the right pane; "Mark delivered" under the step's tag is outlined in orange.](http://support.gilb.com/help/media/700752b69306a060.png)
   What you see: In the table, the cell now shows "ESTIMATE" with −6 s and its % line. Under the step's tag at the top of its column, the outlined link is "Mark delivered": press it once the step has been delivered. The right pane shows the Estimate's "CHANGE" and "AGAINST THE LEVELS".
6. Press "Enter Actual" in the cell.

   In a cell of the delivered step's column, press "Enter Actual" under "ACTUAL". The pane opens with "ACTUAL \(BEFORE → AFTER\)" first and the cursor in "Status before", which holds the Value's "Status" now.

   An Actual is how far the delivered step was measured to move the Value. Until one is entered the pane shows "A —". A person who may not write the step sees "Not entered yet" in the cell and no boxes. "Unit" shows the unit of the Value's "Scale", the ruler it is measured on, and cannot be changed when the Value has one. When the Value has "Meter" lines, which say how its number is found, a "Meter" list, "No meter" first, names the one used.

   ![GilbApp with the delivered step's cell showing its Estimate; the button "Enter Actual" in the cell is outlined in orange.](http://support.gilb.com/help/media/ee7dbc2dee4e3bd7.png)
   What you see: Under the step's tag the column now reads "Status \[date\] Developed", and the line above the table says "1 column delivered · 0 Actuals entered · 1 waiting". In the cell, under "ESTIMATE" and "ACTUAL", press the outlined "Enter Actual".
7. Type the "Status after" and press Enter.

   In "Status after", type where the Value stands now that the step is delivered, as measured, and press Enter. The Actual is saved once this box holds a number.

   Each box saves when you leave it or press Enter; there is no Save button, and "Saved." shows under the boxes. The cell then shows "ACTUAL", the reading as before → after with its evidence tag, and a line starting "Δ": how far the Actual is from the Estimate, and whether it fell "inside" or "outside" the Estimate's "±" range, or "no ± given". Kai-Zen compares each Actual with its Estimate before it picks the next step, and uses the difference to estimate better. For a Resource row, type the amount the step used in "Amount drawn" instead. Text that is not a number gets "Not saved: enter the Status before and after as numbers."

   ![GilbApp with the Actual form in the right pane and 22 typed after the Status; the "Status after" box is outlined in orange.](http://support.gilb.com/help/media/2290f187009ac87b.png)
   What you see: On the right, under "ACTUAL \(BEFORE → AFTER\)", "Status before" already holds 30. Type the new measured number, here 22, in the outlined "Status after" box and press Enter. The line under the box says "Saved once "after" is entered."
8. Under "Evidence tag", choose how the reading was taken.

   In "Evidence tag", choose "REAL" if the reading ran on the real thing, "MOCK" if it ran on a stand-in, or "UNPROVEN" if nothing was run. It shows "UNPROVEN" until you choose.

   The list saves when you choose. "What was run" and "Where" take what was measured and where; they are optional and save when you leave them. In the Kai-Zen method a reading taken elsewhere, such as on a test copy or a smaller set of data, does not move the "Status": it is written beside it, with its condition.

   ![GilbApp with the saved Actual in the right pane; the "Evidence tag" list is outlined in orange.](http://support.gilb.com/help/media/cbfaa58c512f9da7.png)
   What you see: The right pane now says "Saved." and "Δ −2 s · no ± given", and the cell in the table shows the Actual 30 → 22 s. The outlined "Evidence tag" list still reads "UNPROVEN": open it and choose how the reading was taken.
9. Press "Set Status" if the reading is "REAL".

   Under the Actual, GilbApp asks whether to set the Value's "Status" to the measured number, dated today. Press "Set Status" only if the "Evidence tag" is "REAL" and the reading was taken where the stakeholders use it; otherwise press "Not now", which leaves the Value as it is.

   GilbApp offers "Set Status" whatever the "Evidence tag" says, as soon as "Status after" is saved, and adds no "Evidence tag"; the new "Status" keeps the old one's conditions. The question names the Value, its new number and its unit. Nothing is written without the press, and only a person who may write the Value is asked. For a Resource it asks to add the amount used to its "Status". If the Value's "Status" is not one plain number, it says "No Status offer:" and why. The old "Status" stays, and the newest date is the current one, as the answer on updating a Value's Status explains. In the Kai-Zen method each row's "Status" is its latest measured level, and a number that was not measured is not a "Status".

   ![GilbApp with the Actual saved and the offer to set the Value's Status; "Set Status" is outlined in orange.](http://support.gilb.com/help/media/b90bd63ad026afde.png)
   What you see: With "REAL" chosen in "Evidence tag", the right pane asks whether to set the Value's Status to 22 s, dated today, with "Not now" and the outlined "Set Status". Press "Set Status" to make the measured number the Value's new Status.

## Deeper

Also asked:

What are an Estimate, an Actual and an Impact? An Impact is the effect of a step or a Solution on one Value. Its Estimate is the change expected, written before it is built; its Actual is the change measured after delivery. One cell holds both.

To make a Value Tracking Table, press "＋ New" in "Plan", choose "Value Tracking Table" under "TYPE", type a tag in "TAG", keep "Product: Product Values × Solutions" under "LEVEL" and press "Create". The tag box shows "Area.Keyword, e.g. Product.Tracking" until you type, and "More value tracking table details" holds an optional "Title" and "Description". Then press "+ Add Ends &amp; Means". Under "Rows: Product Values and Development Resources", search and select each Value and Development Resource to track in the box that shows "Find a Value or Development Resource by tag"; a Development Resource is what the work uses up, such as money or time. Under "Columns: Value Delivery Steps and Solutions", search and select each step in the box that shows "Find a delivery step or a Solution by tag", and press "Done". A step, a Value Delivery Step, is the Solutions, or parts of them, delivered together in one short cycle to move some Values. [The answer on comparing Solutions in a VDT](http://support.gilb.com/help/how-do-i-compare-solutions-in-a-vdt) shows the same dialog and boxes step by step, and [the answer on writing a step](http://support.gilb.com/help/how-do-i-write-a-step) shows how to make a new step in the columns box.

A whole Solution delivered as a step of its own can be a column too; it has "Mark delivered" and Actuals the same way. An Actual is entered only in a Value Tracking Table; elsewhere GilbApp says "Edit this Actual in its Value Tracking Table." The columns stand in delivery order: a new one goes last, and while "+ Add Ends &amp; Means" is open, "←" and "→" on a column move it. With a Development Resource row, "Order" offers only "Delivery order".

In the Kai-Zen method a Value Tracking Table has the Product Values with "Status", "Tolerable" and "Goal" as rows, then the Development Resources with "Status", "Tolerable" and "Budget", one column per step in delivery order, and in each cell the Estimate, then the Actual, in units and as a %. Kai-Zen fills a step's Estimates before it is built, from today's "Status", and its Actuals after it is delivered and measured, and it adds nothing up across a row. In GilbApp today the Development Resource rows stand above the Values, and an Actual shows as before → after with its "Δ" line, with no %.

In a round of delivery, Kai-Zen has each Value the step targets measured with its "Meter" by an agent other than the one that built the step, writes the Actuals in the step's column, and then updates each "Status". An agent is your AI following one written procedure, its standing instructions, for one kind of work. After the Actuals, Kai-Zen decides whether to keep the step's Solution, throw it away or change it; throwing it away puts each Value's "Status" back, and the Development Resources used stay used. GilbApp has no row for that choice; [the answer on deciding to keep or throw away a step's result](http://support.gilb.com/help/how-do-i-decide-to-keep-or-throw-away-a-steps-result) covers it. After each round Kai-Zen shows you the measured Values and the next step, as [the answer on picking the next step](http://support.gilb.com/help/how-do-i-pick-the-next-step) explains.

This answer is written for a computer screen.

Source: GilbApp af0f04ee838a4d55887d2ff1f72edd49a4ff7ca0 \(https://gilb.com/app/version.json read 2026-11-09, buildTime 2026-11-09.522Z, dirty false\); code read from the archive \(no checkout\). Step 3: PlanTable.tsx:404-452 \(cell button, "+" on hover, opens the pair\), :517-545 \(VTT\_STEPS line and counts "&lt;n\> columns delivered · &lt;n\> Actuals entered · &lt;n\> waiting"\), :775-800 \(a VTT draws Status, Tolerable, Goal and no Combined, Winners, ratio or sum rows; Kai-Zen.VTTRules.NoRowSum\), :1864; PlanImpactsPane.tsx:163-205 \("Impacts" uppercase, "&lt;step\> → &lt;Value\>", Actual section after the Estimate while not delivered\), ImpactActualForm.tsx:68, :80 \("Actual \(before → after\)", drawn uppercase by Section, PlanImpactPane.tsx:290-291; "Not delivered yet. The Actual is entered after delivery."\). Step 4: PlanImpacts "+ Add an impact" \(PlanImpacts.tsx:1912-1945\); PlanTable.tsx:393, :456 \("Estimate" label, uppercase\), :457-481; planKinds.ts:262-269 \(a step holds an Estimate\), :289-295 \(counted once\). Step 5: PlanTable.tsx:547-551, :856-860 \("Mark delivered" under a not-delivered column's tag\); MarkDelivered.tsx:1-4, :66-92 \(only to a person who may write the column, only while not delivered\); PlanFunctionForm.tsx:177-183 \("Developed", dated today, source the person\), :382-388 \(next word after "Developed" is "Production"\); planCard.ts:893-912 \(delivered = "Developed" or "Production"\); PlanImpactsPane.tsx:145-160 \(button "Mark &lt;tag\> delivered"\); planKinds.ts:296-304 \("Delivered: the Estimate stays as it stood. The Actual is above."\). Step 6: PlanTable.tsx:394-396, :501-511 \("Actual" label, "Enter Actual", "Not entered yet"\); PlanImpactsPane.tsx:116-122, :188-199 \(Actual first once delivered; focus in the first box\); ImpactActualForm.tsx:191-198, :246-258 \("Status before" holds the row's Status\), :360 \("A —"\), :366-401 \("Unit" read-only with a unit, "Meter" with "No meter"\). Step 7: ImpactActualForm.tsx:271-333, :372-383 \("Status after", saved once it holds a level; "Amount drawn"\), :417 \("Saved."\), :420-422 \(Learn line\); PlanImpactEstimate.tsx:41-42 \(box saves on leave or Enter\); impactActual.ts:141-149 \(line "A &lt;before\> → &lt;after\> &lt;unit\> · &lt;tag\>"\), :150-193 \(Learn: "Δ", "inside"/"outside" the ±, "no ± given"\), :58 \("Not saved: enter the Status before and after as numbers."\); PlanTable.tsx:489-499 \(cell: "Actual", line without "A ", Learn line\). Step 8: ImpactActualForm.tsx:402-415 \("Evidence tag", "What was run", "Where"\); impactActual.ts:51-55 \("REAL", "MOCK", "UNPROVEN", default "UNPROVEN"\). Step 9: ImpactActualForm.tsx:94-162 \(offer, "Not now", "Set Status", only with write on the Value; nothing written without the press\); statusOffer.ts:26-48 \("Set &lt;Tag\>'s Status to &lt;n\> &lt;unit\>, dated today?", Resource "Add &lt;amount\> to &lt;Tag\>'s Status \(now &lt;n\>\)?", "No Status offer: &lt;Tag\>'s Status could not be read as a number."; no offer when the Status already is that number\), :50-62 \(a new Status line appended\). Deeper: recordTypes.ts:270-291, :473-486 \(VTT dialog: "New value tracking table", "Area.Keyword, e.g. Product.Tracking", Title, Description, LEVEL\); TableCard.tsx:102-111, :615-619, :708 \(pickers\); planKinds.ts:270-278 \(a whole Solution is a delivery column; a Solution Constraint is not\), :306-307 \("Edit this Actual in its Value Tracking Table."\); TableCard.tsx:501-520 \(new column last; move\); planTable.ts:574-575 \("Delivery order" only\); PlanTable.tsx:897-907 \(Resource rows drawn above Value rows\); no Act row \(the code shows none\). Standards \(2026-11-09, all 200\): Kai-Zen.VTTRules \(Rows, Columns, Cell, Estimate, Actual, Status, Act, Learn, NoRowSum\), Kai-Zen.VTTTemplate \(Blank, Example\), Kai-Zen.ValueDeliveryStepRules \(Delivered "A step is delivered when real stakeholders can use it. Measure there, not on a test copy.", Numbers\), Kai-Zen.Cycle \(Measure "by an agent other than the builder", Update, Next\), Kai-Zen.EvidenceRules \(Measured, Tag "REAL \(ran on the real thing\), MOCK \(ran on a stand-in\) or UNPROVEN \(not run\)", Condition "\(a local copy, a smaller set, a stand-in client\) is written beside the Status, with its condition, and does not move it"\), Kai-Zen.UpdateStatus. GilbVeda public read 2026-11-09: t:ValueTrackingTable \(used for the new What-is entry\), t:ImpactActual \(used for the new What-is entry\), t:DeliveryState \("DEVELOPED: it is built and passes its own tests, and it does not yet serve its stakeholders in production. IN-PRODUCTION: it serves its stakeholders in the production system."\). stakeholder and agent glosses \(published\); step 3 and 4 Resource words planTable.ts:228-240 \(figuresOf: a Resource row's third figure "Budget &lt;n\>"\), :296-300 \(Resource cell "Tol &lt;n\>% · Bud &lt;n\>%"\), :333 \(Value cell "Tol &lt;n\>% · Goal &lt;n\>%"\), PlanTable.tsx:832 \(one "Goal" heading for every row\), valuePercent.ts:163-177 \(Resource %: amount over what is left from Status to Tolerable and to Budget\); step 5 GilbVeda t:DeliveryState \(DEVELOPED / IN-PRODUCTION, as read for this page\); step 9 statusOffer.ts:32-48 \(statusOfferFor reads only role, after, amount and unit, never the Evidence tag\), :52-59 \(withNewStatus writes the level with the person as source, no tag or condition\), Kai-Zen.EvidenceRules.Measured, .Tag, .Condition \(Standards 2026-11-09\).